ITIL Security Management - Sure Fit Security

- 04.11

The ITIL security management process describes the structured fitting of security in the management organization. ITIL security management is based on the ISO 27001 standard. According to ISO.ORG "ISO/IEC 27001:2005 covers all types of organizations (e.g. commercial enterprises, government agencies, not-for profit organizations). ISO/IEC 27001:2005 specifies the requirements for establishing, implementing, operating, monitoring, reviewing, maintaining and improving a documented Information Security Management System within the context of the organization's overall business risks. It specifies requirements for the implementation of security controls customized to the needs of individual organizations or parts thereof. ISO/IEC 27001:2005 is designed to ensure the selection of adequate and proportionate security controls that protect information assets and give confidence to interested parties."

A basic concept of security management is the information security. The primary goal of information security is to guarantee safety of information. When protecting information it is the value of the information that must be protected. These values are stipulated by the confidentiality, integrity and availability. Inferred aspects are privacy, anonymity and verifiability.

The goal of the Security Management is split up in two parts:

  1. The realization of the security requirements defined in the service level agreement (SLA) and other external requirements which are specified in underpinning contracts, legislation and possible internal or external imposed policies.
  2. The realization of a basic level of security. This is necessary to guarantee the continuity of the management organization. This is also necessary in order to reach a simplified service-level management for the information security, as it happens to be easier to manage a limited number of SLAs than it is to manage a large number of SLAs.

The input of the security management process is formed by the SLAs with the specified security requirements, legislation documents (if applicable) and other (external) underpinning contracts. These requirements can also act as key performance indicators (KPIs) which can be used for the process management and for the justification of the results of the security management process.

The output gives justification information to the realization of the SLAs and a report with deviations from the requirements.

The security management process has relations with almost all other ITIL-processes. However, in this particular section the most obvious relations will be the relations to the service level management process, the incident management process and the Change Management process.

Sure-Fit Security - 8213 Fenton St - Silver Spring, MD - Keys ...
www.yelp.com



The security management process

The security management process consists of activities that are carried out by the security management itself or activities that are controlled by the security management.

Because organizations and their information systems constantly change, the activities within the security management process must be revised continuously, in order to stay up-to-date and effective. Security management is a continuous process and it can be compared to W. Edwards Deming's Quality Circle (Plan, Do, Check, Act).

The inputs are the requirements which are formed by the clients. The requirements are translated into security services, security quality that needs to be provided in the security section of the service level agreements. As you can see in the picture there are arrows going both ways; from the client to the SLA; from the SLA to the client and from the SLA to the plan sub-process; from the plan sub-process to the SLA. This means that both the client and the plan sub-process have inputs in the SLA and the SLA is an input for both the client and the process. The provider then develops the security plans for his/her organization. These security plans contain the security policies and the operational level agreements. The security plans (Plan) are then implemented (Do) and the implementation is then evaluated (Check). After the evaluation then both the plans and the implementation of the plan are maintained (Act).

The activities, results/products and the process are documented. External reports are written and sent to the clients. The clients are then able to adapt their requirements based on the information received through the reports. Furthermore, the service provider can adjust their plan or the implementation based on their findings in order to satisfy all the requirements stated in the SLA (including new requirements).

Control

The first activity in the security management process is the "Control" sub-process. The Control sub-process organizes and manages the security management process itself. The Control sub-process defines the processes, the allocation of responsibility for the policy statements and the management framework.

The security management framework defines the sub-processes for: the development of security plans, the implementation of the security plans, the evaluation and how the results of the evaluations are translated into action plans. Furthermore, the management framework defines how should be reported to clients.

The activities that take place in the Control process are summed up in the following table, which contains the name of the (sub) activity and a short definition of the activity.

The meta-modeling technique was used in order to model the activities of the control sub-process. The following figure is the meta-process model of the control sub-process. It is based on a UML activity diagram and it gives an overview of the activities of the Control sub-process. The grey rectangle represents the control sub-process and the smaller beam shapes inside of the grey rectangle represent the activities that take place inside the control sub-process. The beams with a black shadow indicate that the activity is a closed (complex) activity. This means that the activity consists of a collection of (sub) activities but these activities are not expanded because they are not relevant in this particular context. The white beam without shadow indicates that the reporting activity is a standard activity. This means that reporting does not contain (sub) activities.

Figure 2.1.1: Meta-process model Control sub-process

Furthermore, it is noticeable that the first two activities are not linked with an arrow and that there is a black stripe with an arrow leading to the reporting activity. This means that the two first activities are not sequential. They are unordered activities and after these two activities have taken place the reporting activity will sequentially follow. For a more extensive explanation of the meta-modeling technique consult the Meta-modeling wiki.

The following table (table 2.1.2) is a concept definition table.

Table 2.1.2: Concept and definition control sub-process Security management

The meta-data model of the control sub-process is based on a UML class diagram. In figure 2.1.2 is the meta-data model of the control sub-process.

Figure 2.1.2: Meta-process model control sub-process

The CONTROL rectangle with a white shadow is an open complex concept. This means that the CONTROL rectangle consists of a collection of (sub) concepts and these concepts are expanded in this particular context.

The following picture (figure 2.1.3) is the process-data model of the control sub-process. This picture shows the integration of the two models. The dotted arrows indicate which concepts are created or adjusted in the corresponding activities.

Figure 2.1.3: Process-data model control sub-process

Plan

The Plan sub-process contains activities that in cooperation with the Service Level Management lead to the (information) Security section in the SLA. Furthermore, the Plan sub-process contains activities that are related to the underpinning contracts which are specific for (information) security.

In the Plan sub-process the goals formulated in the SLA are specified in the form of Operational Level Agreements (OLA). These OLA's can be defined as security plans for a specific internal organization entity of the service provider.

Besides the input of the SLA, the Plan sub-process also works with the policy statements of the service provider itself. As said earlier these policy statements are defined in the control sub-process.

The Operational Level Agreements for information security are set up and implemented based on the ITIL process. This means that there has to be cooperation with other ITIL processes. For example if the security management wishes to change the IT infrastructure in order to achieve maximum security, these changes will only be done through the Change Management process. The Security Management will deliver the input (Request for change) for this change. The change Manager is responsible for the Change Management Process itself.

Table 2.3.1 shows the activity plan the (sub) activities and their definition.

Table 2.2.1: (Sub) activities and descriptions Plan sub-process ITIL Security Management

As well as for the Control sub-process the Plan sub-process has been modeled using the meta-modeling technique. On the right side of figure 2.2.1 the meta-process model of the Plan sub-process is given.

As you can see the Plan sub-process consists of a combination of unordered and ordered (sub) activities. Furthermore, it is noticeable that the sub-process contains three complex activities which are all closed activities and one standard activity. Table 2.2.1 consists of concepts that are created or adjusted during the plan sub-process. The table also gives a definition of these concepts.

Table 2.2.2: Concept and definition Plan sub-process Security management

Just as the Control sub-process the Plan sub-process is modeled using the meta-modeling technique. The left side of figure 2.2.1 is the meta-data model of the Plan sub-process.

The Plan rectangle is an open (complex) concept which has an aggregation type of relationship with two closed (complex) concepts and one standard concept. The two closed concepts are not expanded in this particular context.

The following picture (figure 2.2.1) is the process-data diagram of the Plan sub-process. This picture shows the integration of the two models. The dotted arrows indicate which concepts are created or adjusted in the corresponding activities of the Plan sub-process.

Figure 2.2.1: Process-data model Plan sub-process

Implementation

The Implementation sub-process makes sure that all measures, as specified in the plans, are properly implemented. During the Implementation sub-process no (new) measures are defined nor changed. The definition or change of measures will take place in the Plan sub-process in cooperation with the Change Management Process.

The activities that take place in the implementation sub-process are summed up in the following table (table 2.3.1). The table contains the name of the (sub) activity and a short definition of the activity.

Table 2.3.1: (Sub) activities and descriptions Implementation sub-process ITIL Security Management

The left side of figure 2.3.1 is the meta-process model of the Implementation phase. The four labels with a black shadow mean that these activities are closed concepts and they are not expanded in this context. It is also noticeable that there are no arrows connecting these four activities this means that these activities are unordered and the reporting will be carried out after the completion of al the four activities.

During the implementation phase there are a number of concepts that are created and /or adjusted. See table 2.3.2 for an overview of the most common concepts and their description.

Table 2.3.2: Concept and definition Implementation sub-process Security management

The concepts created and/or adjusted are modeled using the meta-modeling technique. The right side of figure 2.3.1 is the meta-data model of the implementation sub-process.

The implementation documents are an open concept and is expanded upon in this context. It consists of four closed concepts which are not expanded because they are irrelevant in this particular context.

In order to make the relations between the two models clearer the integration of the two models are illustrated in figure 2.3.1. The dotted arrows running from the activities to the concepts illustrate which concepts are created/ adjusted in the corresponding activities.

Figure 2.3.1: Process-data model Implementation sub-process

Evaluation

The evaluation of the implementation and the plans is very important. The evaluation is necessary to measure the success of the implementation and the Security plans. The evaluation is also very important for the clients (and possibly third parties). The results of the Evaluation sub-process are used to maintain the agreed measures and the implementation itself. Evaluation results can lead to new requirements and so lead to a Request for Change. The request for change is then defined and it is then send to the Change Management process.

Mainly there are three sorts of evaluation; the Self-assessment; internal audit, and external audit.

The self-assessment is mainly carried out in the organization of the processes. The internal audits are carried out by internal IT-auditors and the external audits are carried out by external independent IT-auditors. Besides, the evaluations already mentioned an evaluation based on the communicated security incidents will also take place. The most important activities for this evaluation are the security monitoring of IT-systems; verify if the security legislation and the implementation of the security plans are complied; trace and react to undesirable use of the IT-supplies.

The activities that take place in the evaluation sub-process are summed up in the following table (Table 2.4.1). The table contains the name of the (sub) activity and a short definition of the activity.

Table 2.4.1: (Sub) activities and descriptions Evaluation sub-process ITIL Security Management

Figure 2.4.1: Process-data model Evaluation sub-process

The process-data diagram illustrated in the figure 2.4.1 consists of a meta-process model and a meta-data model. The Evaluation sub-process was modeled using the meta-modeling technique. The dotted arrows running from the meta-process diagram (left) to the meta-data diagram (right) indicate which concepts are created/ adjusted in the corresponding activities. All of the activities in the evaluation phase are standard activities. For a short description of the Evaluation phase concepts see Table 2.4.2 where the concepts are listed and defined.

Table 2.4.2: Concept and definition evaluation sub-process Security management

Maintenance

It is necessary for the security to be maintained. Because of changes in the IT-infrastructure and changes in the organization itself security risks are bound to change over time. The maintenance of the security concerns both the maintenance of the security section of the service level agreements and the more detailed security plans.

The maintenance is based on the results of the Evaluation sub-process and insight in the changing risks. These activities will only produce proposals. The proposals serve as inputs for the plan sub-process and will go through the whole cycle or the proposals can be taken in the maintenance of the service level agreements. In both cases the proposals could lead to activities in the action plan. The actual changes will be carried by the Change Management process. For more information about the Change Management Process consult the Change Management Wiki.

The activities that take place in the maintain sub-process are summed up in the following table (Table 2.5.1). The table contains the name of the (sub) activity and a short definition of the activity.

Table 2.5.1: (Sub) activities and descriptions Maintenance sub-process ITIL Security Management

Figure 2.5.1 is the process-data diagram of the implementation sub-process. This picture shows the integration of the meta-process model (left) and the meta-data model (right). The dotted arrows indicate which concepts are created or adjusted in the activities of the implementation phase.

Figure 2.5.1: Process-data model Maintenance sub-process

The maintenance sub-process starts with the maintenance of the service level agreements and the maintenance of the operational level agreements. After these activities take place (in no particular order) and there is a request for a change the request for change activity will take place and after the request for change activity is concluded the reporting activity starts. If there is no request for a change then the reporting activity will start directly after the first two activities. The concepts in the meta-data model are created/ adjusted during the maintenance phase. For a list of the concepts and their definition take a look at table 2.5.2.

Table 2.5.2: Concept and definition Plan sub-process Security management

Complete process-data model

The following picture shows the complete process-data model of the Security Management process. This means that the complete meta-process model and the complete meta-data model and the integrations of the two models of the Security Management process are shown.

Figure 2.6.1: Process-data model Security Management process

Sure Fit Security Video




Relations with other ITIL processes

The security Management Process, as stated in the introduction, has relations with almost all other ITIL-processes. These processes are:

  • IT Customer Relationship Management
  • Service Level Management
  • Availability Management
  • Capacity Management
  • IT Service Continuity Management
  • Configuration Management
  • Release Management
  • Incident Management & Service Desk
  • Problem Management
  • Change Management (ITSM)

Within these processes there are a couple of activities concerning security that have to take place. These activities are done as required. The concerning process and its process manager are responsible for these activities. However, the Security Management will give indications to the concerning process on how these (security specific) activities should be structured.

Safes in stock! | Yelp
www.yelp.com


Example

Internal E-mail Policies.

The use of internal e-mail in an organization has a lot of security risks. So if an organization chooses to use e-mail as a means of communication, it is highly recommended that the organization implements a well thought out e-mail security plan/policies. In this example the ITIL security Management approach is used to implement e-mail policies in an organization.

First of all, the Security management team is formed and the guidelines of how the process should be carried out are formulated and made clear to all employees and providers concerned. These actions are carried out in the Control phase of the Security Management process.

The next step in the process to implement e-mail policies is the Planning phase. In the Planning phase, the policies are formulated. Besides the policies that are already written in the Service Level Agreements, the policies that are specific to e-mail security are formulated and added to the service level agreements. At the end of this phase the entire plan is formulated and is ready to be implemented.

The following phase in the process is the actual implementation of the e-mail policies, which is done according to the plan which was formulated in the preceding phase (Plan phase).

After the actual implementation the e-mail policies will be evaluated. In order to evaluate the implemented policies the organization will perform self-assessments, or have internal or external auditors review the policies for design and operating effectiveness.

The last phase is the maintenance phase. In the maintenance phase the implemented e-mail policies are maintained. The organization now knows which policies are properly implemented and are properly followed, which policies need more work in order to help the security plan of the organization, and if there are new policies that have to be implemented. At the end of this process the Request for Change are formulated (if needed) and the e-mail policies are properly maintained.

In order for the organization to keep its security plan up-to-date the organization will have to perform the security management process continuously. There is no end to this process; an organization can always better its security.



Are You Looking for Products

Here some products related to "ITIL Security Management".

Amazon.com: X-1 (Powered by H2O Audio) XB1-BK-X Amphibx Fit ...
X-1 (Powered by H2O Audio..
Amazon.com : Samsung Secured Digital Wireless Baby Audio Monitor ...
Amazon.com : Samsung Secu..
3M SecureFit Protective Eyewear SF202AS, Gray Lens, Anti Scratch ...
3M SecureFit Protective E..
Amazon.com: Belkin Slim-Fit Plus Armband for iPhone 5 / 5S / 5c ...
Belkin Slim-Fit Plus Armb..

Get these at Amazon.com

* amzn.to is official short URL for Amazon.com, provided by Bitly

Source of the article : here





EmoticonEmoticon

 

Start typing and press Enter to search